Construction technology and steps of steel structure silo

The construction technology and steps of steel structure silo can be summarized as the following main steps:

1. Foundation preparation: Before construction, foundation preparation needs to be carried out. This includes clearing the site, measuring and sizing the foundation, and making sure the foundation is flat and solid.

2. Steel structure production: According to the design requirements and specifications, the steel structure silo is produced. This includes cutting and machining steel, welding components, and assembling silo walls, roof and bottom structures, etc.

3. Install steel columns and support structures: Install the prefabricated steel columns and support structures onto the foundation, and perform welding or bolt connections at the fixed points of the foundation to ensure a stable structure.

4. Install the silo wall panels: Install the prefabricated silo wall panels to the support structure in sequence and fix them by welding or bolting to form the cylindrical shape of the silo.

5. Install the top structure: Install the prefabricated top structure to the top of the silo and fix it by welding or bolting. Top structures usually include skylights, manholes, ventilation equipment, etc.

6. Install the bottom structure: Install the prefabricated bottom structure to the bottom of the silo and fix it by welding or bolting. The bottom structure usually includes the discharge port, supporting legs and unloading equipment.

7. Anti-corrosion treatment: Perform anti-corrosion treatment on the steel structure silo, such as spraying anti-corrosion paint, galvanizing, etc., to improve its anti-corrosion performance and service life.

8. Inspection and debugging: Conduct quality inspection on the completed steel structure silo, including dimensional measurement, weld quality inspection, etc., to ensure that the construction quality meets the requirements. At the same time, equipment debugging and functional testing are carried out.

9. Completion cleanup: Clean up the construction site, dispose of waste materials and garbage, and make it comply with environmental sanitation requirements.

Please note that specific construction techniques and steps may vary depending on design requirements, project size and material selection. In actual construction, relevant specifications and standards should be followed and operated by a professional construction team.

steel structure silo

The Indian government is considering revising the steel export tariff policy

Live chat

Classic Case

Learn More

LEAVE A MESSAGE

We will serve you wholeheartedly, contact us through online consulting, demand table submission, e-mails, telephones, etc.

Success!
Error!
Address
Xicheng Science&Technology Building, High-tech Zone, Zhengzhou, China
Hotline
0086-371-86151827
Fax
0086-371-86011881
E-mail
sales@bebonchina.com
Live chat

Customized according to drawings

24h Technical support

Customized according to samples

24h Technical support