The protection measures for the riser of the offshore platform adopt the combination of the complex-wall tubular riser and the riser protection pile. Set up 2 riser pipe clamps on the platform pile, one is used to fix the subsea pipeline riser, and the other is used as a guide bracket for the riser. After the flat pipe section of the submarine pipeline is connected with the riser, the riser is installed on the platform pile foundation.
Process: cutting, welding, rolling, drilling, etc.